International Journal of Mechanical and Production Engineering (IJMPE)
.
Follow Us On :
current issues
Volume-12,Issue-1  ( Jan, 2024 )
Past issues
  1. Volume-11,Issue-12  ( Dec, 2023 )
  2. Volume-11,Issue-11  ( Nov, 2023 )
  3. Volume-11,Issue-10  ( Oct, 2023 )
  4. Volume-11,Issue-9  ( Sep, 2023 )
  5. Volume-11,Issue-8  ( Aug, 2023 )
  6. Volume-11,Issue-7  ( Jul, 2023 )
  7. Volume-11,Issue-6  ( Jun, 2023 )
  8. Volume-11,Issue-5  ( May, 2023 )
  9. Volume-11,Issue-4  ( Apr, 2023 )
  10. Volume-11,Issue-3  ( Mar, 2023 )

Statistics report
Apr. 2024
Submitted Papers : 80
Accepted Papers : 10
Rejected Papers : 70
Acc. Perc : 12%
Issue Published : 130
Paper Published : 2388
No. of Authors : 6802
  Journal Paper


Paper Title :
Life Cycle Assessment Of Solar Photovoltaic Electricity Generating System

Author :Asif Ali, Aarif Zaheer, Osama Khan

Article Citation :Asif Ali ,Aarif Zaheer ,Osama Khan , (2013 ) " Life Cycle Assessment Of Solar Photovoltaic Electricity Generating System " , International Journal of Mechanical and Production Engineering (IJMPE) , pp. 08-11, Volume-1,Issue-6

Abstract : Solar photovoltaic based electricity is considered to be free from fossil fuels usage and greenhouse gases emissions but a considerable amount of non-renewable sources utilized during its manufacturing, installation, transportation of solar PV modules and it components. LCA (life cycle assessment) study is called as cradle to grave study of system. It is uses to calculate the energy consumption in manufacturing, installation, transportation of solar PV systems. LCA goal is to calculate EPBT, GHG emission and embodied energy. It is also concerned with efficiency and economicanalysis of plant. India is presently sixth largest electricity generating country and accounts for about 4 % of the world’s total annual electricity generation. India is also currently rankedsixth in annual electricity consumption accounting for about 3.5 % of the world’s total annual electricity consumption. In this paper, LCA study of keasv puram solar power plant (1MW) situated in north Delhi has been done. It has 5571 solar power panel made up of mono crystalline, electricity generated is fed into main grid line of NDPL.This paper incorporates comprehensive LCA (life cycle assessment) study of a solar power plant (Keshavpuram-1MW).

Type : Research paper

Published : Volume-1,Issue-6


DOIONLINE NO - IJMPE-IRAJ-DOIONLINE-399   View Here

Copyright: © Institute of Research and Journals

| PDF |
Viewed - 42
| Published on 2014-01-23
   
   
IRAJ Other Journals
IJMPE updates
Volume-12,Issue-1 (Jan, 2024 )
The Conference World

JOURNAL SUPPORTED BY